Final | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison
|
Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison..R/I AND 20LB GAS OK
|
Rough-in | 5/27/2014 | 5/28/2014 | 5/28/2014 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison..20LB GAS OK..FLUE TEST OK..DUCT BLAST OK.....NEED SHUT-OFF VALVES AT GAS EQUIPMENT..NEED TRANSFER GRILLE IN BEDROOM #2..NEED SUPPLY DUCT IN MECH AND UTILITY ROOMS..WHAT IS THE CFM ON KITCHEN EXHAUST?
|
Rough-in | 5/23/2014 | 5/27/2014 | 5/27/2014 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|
Rough-in | 5/20/2014 | 5/22/2014 | 5/22/2014 | P | NR |
Dixie Fellows
|
|
|
RI and gas test Phone #: ###-#### >> Inspection requested via web by Brad Allison..no manual j..no test on flue
|