Final | 6/16/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Troy James
|
|
|
Please call Ryan so he can meet you down there Phone #: ###-#### Inspection requested via web by Shelia Gibson
|
Rough-in | 3/18/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson ok IT area
|
Final | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | CANC |
Troy James
|
|
|
Bruce or Rich (###-#### ) Phone #: ###-#### cannot final until kitchen equipment is installed to verify compliance
|
Rough-in | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Troy James
|
|
|
Bruce or Rich (###-#### ) Phone #: ###-#### ok to cover ceiling
|
Rough-in | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson ok to cover print shop
|
Rough-in | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson Need to support flex ducts and seal the inner liner to all new connections.
|
Rough-in | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson ok to cover ceiling at HR annex
|
Rough-in | 1/8/2015 | 1/9/2015 | 1/9/2015 | A | FAIL |
Troy James
|
|
|
1st floor Annex Phone #: ###-#### Inspection requested via web by Shelia Gibson Need to have the hydronic lines insulated before approval for ceiling cover.
|
Rough-in | 10/15/2014 | 10/16/2014 | 10/15/2014 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson ok ceiling 4th floor lobby
|
Rough-in | 10/10/2014 | 10/13/2014 | 10/14/2014 | A | FAIL |
Troy James
|
|
|
###-####.. Need to have installer meet me on site to remove ceiling tiles to perform inspection. Nobody called me back with number above.
|
Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | PEND |
Dixie Fellows
|
|
|
CH2 4th floor elevator lobby Phone #: ###-#### >> Inspection requested via web by Shelia Gibson..i called the contact and he said it was ok to reschedule for mon am with troy
|
Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PASS |
Troy James
|
|
|
Richard Scown 3rd floor elevator lobby Phone #: ###-#### Inspection requested via web by Shelia Gibson ok to cover ceiling
|
Rough-in | 8/28/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Troy James
|
|
|
CH2 2nd floor elevator lobby Phone #: ###-#### Inspection requested via web by Shelia Gibson
|
Final | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PART |
Troy James
|
|
|
richard ###-#### ok to final basement and first floor elevator
|
Final | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PEND |
Dixie Fellows
|
|
|
Richard Phone #: ###-####..rescheduled for troy for tues am
|
Rough-in | 6/18/2014 | 6/19/2014 | 6/19/2014 | A | PASS |
Troy James
|
|
|
bruce - basement lobby CH2 Phone #: ###-####
|