Permit Information
Permit NumberMEC14-02170
StatusFinaled
Name TML LLC
Site Address 5301 E WARM SPRINGS AVE
Project Name 
Customer Number19870
ePlanReviewNo
Description
Mechanical Permit - New: Terraces Petra permit 2 BLD13-00182
Phase 1 & phase 2
HVAC Dryside
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/1/201510/2/201510/2/2015APASS
DetailsChad Schwendiman
Ben ###-####/final Phone #: ###-#### Inspection requested via web by Crystal Grant
Rough-in10/1/201510/1/201510/1/2015PCANC
DetailsChad Schwendiman
Ben ###-####/D parking garage, residents storage , elevator lobby temp occupancy. Phone #: ###-#### Inspection requested via web by Crystal Grant - This was scheduled on the wrong permit.
Final9/22/20159/22/20159/22/2015PPART
DetailsChad Schwendiman
Ben ###-####/Temporary occupancy D;E Phone #: ###-#### Inspection requested via web by Crystal Grant - D, and E okay on 1st through 3rd floors
Rough-in8/10/20158/11/20158/11/2015APART
DetailsChad Schwendiman
Ben/###-####/E garage elevator lobby hard lid Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover ceiling
Rough-in7/29/20157/29/20157/29/2015PPART
DetailsChad Schwendiman
Ben/###-####/E 2nd and 3rd floor corridors grid Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover grid ceilings
Rough-in7/21/20157/22/20157/22/2015PPART
DetailsChad Schwendiman
Rough in 1st floor E Corridor
Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - okay to cover hard lids in corridoors on 1st floor wings E, F, 2nd floor wings G, F, 3rd floor wing G
Final6/5/20156/8/20156/8/2015APART
DetailsChad Schwendiman
Ben ###-####/D commons,kitchen,dining final Phone #: ###-#### Inspection requested via web by Crystal Grant - c wing, and d wing common area 1st and 2nd floor okay
Rough-in5/22/20155/26/20155/26/2015APART
DetailsChad Schwendiman
Ben/###-####/ 2 2nd floor D hallway. Grid, Note: this is what you looked at Friday,Chad. Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover ceiling in hallway of d wing 2nd floor
Final5/18/20155/19/20155/19/2015APART
DetailsChad Schwendiman
Ben ###-####/ Final C all floors. Phone #: ###-#### Inspection requested via web by Crystal Grant - all the living units in wing C are okay. need to label the fire damper access points in the corridoor, and finish installing the duct access doors. Area D, and E are not ready yet
Rough-in5/15/20155/18/20155/18/2015APART
DetailsChad Schwendiman
Ben/###-####/2nd floor corridor building E Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover hard lids and soffits 2nd floor E
Rough-in5/13/20155/13/20155/13/2015PFAIL
DetailsChad Schwendiman
Ben ###-####/building E 2nd floor corridor. Phone #: ###-#### Inspection requested via web by Crystal Grant - need to complete duct work
Final5/7/20155/8/20155/8/2015AFAIL
DetailsChad Schwendiman
Ben/###-####/3rd floor C Phone #: ###-#### Inspection requested via web by Crystal Grant - Need to complete duct sealing
Rough-in5/1/20155/1/20155/1/2015APART
DetailsChad Schwendiman
Ben ###-####/3rd floor E corridors. Hard lids Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover
Rough-in4/9/20154/10/20154/10/2015PPART
DetailsChad Schwendiman
Ben ###-####/Inspection area D commons grid. Tomorrow PM Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover grid ceiling 1st floor of D
Rough-in4/7/20154/8/20154/8/2015APART
DetailsChad Schwendiman
Ben ###-####/elevator 2 lobby. Building D hard lid Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover hard lid in elevator lobby 2 in the basement.
Rough-in4/6/20154/7/20154/7/2015PPART
DetailsChad Schwendiman
Ben ###-####/2nd floor building D corridor hard lids. Phone #: ###-#### Inspection requested via web by Crystal Grant - 2nd floor building d hard lids in corridoor okay to cover
Rough-in3/31/20153/31/20153/31/2015APART
DetailsChad Schwendiman
Ben ###-####.Inspection 1st floor sofit building E. Phone #: ###-#### Inspection requested via web by Crystal Grant - area E 1st floor soffits okay to cover
Rough-in3/5/20153/6/20153/6/2015PPART
DetailsChad Schwendiman
Ben/###-####/ Building C approve cover for corridors. Phone #: ###-#### Inspection requested via web by Crystal Grant - 1st floor corridoor soffits okay to cover
Rough-in2/27/20153/2/20153/2/2015APART
DetailsChad Schwendiman
Ben/###-####/3rd floor soffits Phone #: ###-#### Inspection requested via web by Crystal Grant - Are E 3rd floor okay to cover soffits
Rough-in2/24/20152/25/20152/25/2015APART
DetailsChad Schwendiman
Ben ###-####/ 2nd floor d approve for cover. AM Phone #: ###-#### Inspection requested via web by Crystal Grant - 2nd floor area d okay to cover soffits
Rough-in2/17/20152/18/20152/18/2015APART
DetailsBill VanDegrift
Ben ###-####/2nd floor C. Corridors hard lid Phone #: ###-#### Inspection requested via web by Crystal Grant area H trunk seal ok. area A,B,C hard lid angles at dampers ok
Rough-in2/13/20152/17/20152/17/2015APART
DetailsChad Schwendiman
Ben ###-####. 1st floor D approve for cover. Phone #: ###-#### Inspection requested via web by Crystal - 1st. floor area D soffits, and hard lids okay to cover
Rough-in2/9/20152/10/20152/10/2015APART
DetailsChad Schwendiman
Ben ###-####/Building D hard lid sofits. 1st floor Phone #: ###-#### Inspection requested via web by Crystal Grant - Duct seal okay, Need to reinspect after insulation is done
Rough-in2/9/20152/9/20152/9/2015ACANC
DetailsChad Schwendiman
Ben/###-####/Building D hard lid sofits. 1st floor Phone #: ###-#### >> Inspection requested via web by Crystal Grant Inspection cancelled from web by: Crystal Grant
Rough-in2/5/20152/6/20152/6/2015PPART
DetailsChad Schwendiman
Area D 1st floor soffit.
Also Fire damper clearances.
Contact ben ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - Area D 2nd floor fire damper clearances pass on 3 shafts. Area D 1st. floor soffits not ready
Rough-in2/4/20152/5/20152/5/2015APART
DetailsChad Schwendiman
Area D Duct sealer, fire damper clearance.
Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - Duct seal okay in area d rooms 141, and 134. Fire damper clearance fail. Need dampers installed at time of rough in inspection, Need froaming around all 4 sides of the duct with the correct expansion clearances per manufacture.
Rough-in1/30/20152/2/20152/2/2015PPART
DetailsEric Strole
OK to cover hard lid in corridors C wing 3rd flr only. Will call for inspection on the rest when grid installed
Rough-in1/16/20151/20/20151/20/2015APART
DetailsEric Strole
building C fire smoke damper clearance and Building D corridors 2nd floor Eric you looked at D Friday. Ben ###-#### Phone #: ###-#### Inspection requested via web by Crystal Grant-D-wing 2nd flr corridor ok to cover. C-wing fire/smoke dampers clearances all flrs pass.
Rough-in1/8/20151/9/20151/9/2015PPART
DetailsEric Strole
Ben ###-####/Inspection for terraces building E 1,2, 4th floors Prerock. Phone #: ###-#### Inspection requested via web by Crystal Grant-1st and 2nd flr ceiling rough-in e-wing pass.
Rough-in1/5/20151/6/20151/6/2015APART
DetailsEric Strole
Ben ###-####/Terraces, inspiration building Even 3rd floor Prerock Phone #: ###-#### Inspection requested via web by Crystal Grant-3rd flr e-wing above lid r/i pass
Rough-in12/31/20141/2/20151/2/2015PCANC
DetailsChad Schwendiman
Called Ben. He said nobody is on site and he's not sure this is ready. He said to cancel and he would reschedule
Rough-in12/30/201412/31/201412/31/2014ANR
DetailsEric Strole
Area E 3rd floor RI for cover.
Contact Jesse ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty-not ready
Rough-in12/24/201412/24/201412/24/2014PPART
DetailsBill VanDegrift
Duct inspection for insulation Area D 1st floor
Contact Jesse ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty trunk lines ok to insulate 1st floor
Rough-in12/19/201412/22/201412/22/2014APART
DetailsChad Schwendiman
Area D. 2nd floor prerock. Rooms only. Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Crystal Grant - Okay to cover
Rough-in12/16/201412/17/201412/17/2014APASS
DetailsTroy James
###-#### Ben Livingston. 1st floor C. Soffit Phone #: ###-#### >> Inspection requested via web by Crystal Grant
Rough-in12/10/201412/10/201412/10/2014APART
DetailsEric Strole
1st & 2nd flrs corridors pass
Rough-in10/29/201410/29/201410/29/2014PPART
DetailsEric Strole
Area C 3rd floor soffitt RI.
Contact Ben ###-#### Inspection requested via web by Dan Flaherty-3rd flr C-wing soffit rough-in pass.
Rough-in10/23/201410/24/201410/24/2014PPART
DetailsEric Strole
C Wing 3rd Floor soffit RI.
Contact Ben ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty-soffit r/i for units in c-wing 307,308,309,310 ok to cover.
Rough-in10/23/201410/23/201410/23/2014PNR
DetailsChad Schwendiman
Not ready until tomorrow afternoon
Rough-in10/23/201410/23/201410/23/2014PCANC
DetailsEric Strole
3rd floor C-wing soffitt RI.
Contact ben ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty Inspection cancelled from web by: Dan Flaherty
Rough-in10/13/201410/13/201410/13/2014PPART
DetailsChad Schwendiman
line sets in walls okay c wing
Rough-in9/10/20149/11/20149/11/2014APART
DetailsChad Schwendiman
RI for 3rd floor C section.
Contact Ben ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty - okay to cover bottom of tgi's on 3rd floor.
Rough-in8/14/20148/15/20148/15/2014APART
DetailsChad Schwendiman
RI for Phase 1 area C 1st floor Corridors
Contact Ben ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty - okay to cover corridor bottom of joists - C, B, A