Final | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN mechanical contractor to seal the two 6" holes in ceiling of mechanical room. Owner decided not to install the HRV unit.
|
Rough-in | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN
|
Rough-in | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN - house has been insulated with out a rough-in inspection being done. need to remove insulation and expose all hvac ducting and gas piping so it can be inspected.
|
Rough-in | 6/18/2014 | 6/19/2014 | 6/19/2014 | A | CANC |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN Inspection cancelled from web by: GREGORY ANDERSEN
|
Rough-in | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN NEED TO HAVE THE APPROVED MANUAL J ON-SITE.
|
Pressure Test | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN 20LB GAS PRESSURE PASS.
|