Final | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart
|
Final | 8/5/2014 | 8/6/2014 | 8/6/2014 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart..no air balance report on site..reinspection fee
|
Pressure Test | 7/7/2014 | 7/9/2014 | 7/9/2014 | P | PASS |
Dixie Fellows
|
|
|
HVAC Installation Phone #: ###-#### >> Inspection requested via web by Randy Hart..20LB GAS OK
|
Rough-in | 7/7/2014 | 7/9/2014 | 7/9/2014 | P | PASS |
Dixie Fellows
|
|
|
HVAC Installation Phone #: ###-#### >> Inspection requested via web by Randy Hart..r/i ok...NEED TO CHECK DUCT BLAST AT FINAL
|