Final | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PASS |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-####
|
Final | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | FAIL |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-#### - water heater vent not done
|
Rough-in | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Chad Schwendiman
|
|
|
Pressure test also please-Ollie Phone #: ###-#### - 5lb flue pressure pass, & rough in pass
|
Pressure Test | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Eric Strole
|
|
|
Oleg Phone #: ###-####-20 lb gas test pass
|
Rough-in | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | FAIL |
Eric Strole
|
|
|
Oleg Phone #: ###-####-No manual-j on site and no test on flue
|