Final | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PASS |
Dixie Fellows
|
|
|
###-#### they now have the electrical permit
|
Final | 8/21/2014 | 8/22/2014 | 8/22/2014 | P | PEND |
Eric Strole
|
|
|
This is for early pm inspection. Please call Chad B4 arrival to arrange access Phone #: ###-#### Inspection requested via web by Lisa Whitney-Will final when electrical permit is issued.
|
Pressure Test | 8/21/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Eric Strole
|
|
|
This is for early pm inspection. Please call Chad B4 arrival to arrange access Phone #: ###-#### Inspection requested via web by Lisa Whitney-20 lb gas test pass.
|