Final | 4/13/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Chad Schwendiman
|
|
|
the gas pressure test was completed. this should have been finaled out.
|
Pressure Test | 8/22/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves - 20LB GAS PRESSURE PASS
|
Pressure Test | 8/20/2014 | 8/21/2014 | 8/21/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves - WHERE GAS PIPE PASSES THROUGH EXTERIOR WALL IT NEEDS TO BE WRAPPED WITH A INERT MATERIAL, NEED 18GA. YELLOW TRACER WIRE RAN WITH UNDERGROUND GAS LINE.
|