Final | 11/11/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Chad Schwendiman
|
|
|
Please call Chad B4 arrival Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
Final | 9/16/2014 | 9/16/2014 | 9/17/2014 | P | PART |
Bill VanDegrift
|
|
|
GATE CODE *6789 met Chad for a conference on site
|
Final | 9/15/2014 | 9/16/2014 | 9/16/2014 | P | PART |
Chad Schwendiman
|
|
|
This is for Late PM inspection please call Chad B4 arrival to arrange time and access. Phone #: ###-#### >> Inspection requested via web by Lisa Whitney - 5LB FLUE PRESSURE PASS. WAITING ON INFO FROM BOILER MANUFACTURE BEFORE COMPLETING FINAL.
|
Final | 9/9/2014 | 9/10/2014 | 9/10/2014 | P | FAIL |
Bill VanDegrift
|
|
|
Please call Chad B4 arrival Phone #: ###-#### Inspection requested via web by Lisa Whitney 1) provide information showing compliance with ISPC appendix L for heat exchangers and labeling. 2) provide information showing rubber cupplings are approved in a category IV venting system. 3) r.p. required on heating system makeup water 4) test PVC flue
|