Final | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Allie Courter
|
Final | 11/17/2014 | 11/18/2014 | 11/18/2014 | P | CANC |
Chad Schwendiman
|
|
|
Air balance will be done today please call me before so I can find out if it has been done. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
Final | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | CANC |
Chad Schwendiman
|
|
|
Late AM please. Thanks. Phone #: ###-#### Inspection requested via web by April Thomas - this should have been schedualed as a rough in, I entered it as one.
|
Rough-in | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Chad Schwendiman
|
|
|
Late AM please. Thanks. Phone #: ###-#### Inspection requested via web by April Thomas
|
Rough-in | 10/7/2014 | 10/7/2014 | 10/7/2014 | P | FAIL |
Eric Strole
|
|
|
Late afternoon please. Thanks. Phone #: ###-#### Inspection requested via web by April Thomas-6" fresh air needs to tie-in at the return air plenum.
|
Pressure Test | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas-20 lb gas test pass
|
Rough-in | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas-Need approved manual-j on site for rough-in inspection.
|