Final | 1/19/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Pressure Test | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Chad Schwendiman
|
|
|
Duct Blast at 10 am. Call Chris at ###-#### if need to change the time. Thank you! Phone #: ###-#### Inspection requested via web by Debbie Marino - 20lb gas, 5lb flue, duct blast pass
|
Rough-in | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Chad Schwendiman
|
|
|
Duct Blast at 10 am. Call Chris at ###-#### if need to change the time. Thank you! Phone #: ###-#### Inspection requested via web by Debbie Marino
|