Final | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PASS |
Eric Strole
|
|
|
Please be in the late morning with call on way Caleb ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
Final | 1/7/2015 | 1/7/2015 | 1/7/2015 | P | NR |
Chad Schwendiman
|
|
|
Please be in the afternoon with call on way Brad ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - range & vent not installed yet
|
Rough-in | 10/21/2014 | 10/21/2014 | 10/21/2014 | P | PART |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas - okay to cover, still need to submit a manual J, and manual S
|
Pressure Test | 10/21/2014 | 10/21/2014 | 10/21/2014 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas - 20lb gas to range, 5lb flue pass
|
Pressure Test | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas 20# GAS TEST OK FLUE NOT READY
|
Final | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by April Thomas provide ACCA report for extensive remodel, rough in not ready.
|