Final | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | PASS |
Chad Schwendiman
|
|
|
Ben/###-####/Garage a,b,c, final Phone #: ###-#### Inspection requested via web by Crystal Grant
|
Conference | 3/19/2015 | 3/19/2015 | 3/19/2015 | A | DONE |
Chad Schwendiman
|
|
|
Look at condensates on air handlers - secondary condensate drains need to be piped down to the floor or have a wet switch installed
|
Rough-in | 12/5/2014 | 12/8/2014 | 12/8/2014 | P | PART |
Eric Strole
|
|
|
Ben w/TML, 2nd floor area B, soffit RI Phone #: ###-#### Inspection requested via web by Michele LaMott-Soffit rough-in on 2nd flr B-wing pass.
|
Rough-in | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PART |
Chad Schwendiman
|
|
|
1st ; 2nd floor pre-rock RI. Contact ben ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - 1st. floor wings a, b, & c tgi's okay to cover in the units. 2nd. floor wing a okay to cover bottom of joists in the units. Need to remove insulation in tgi's on 2nd. floor wings b, and c to expose hvac for inspection.
|