Final | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Mec-Aging Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 | | PART |
Eric Strole
|
|
|
wip
|
Pressure Test | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy-60 lb test pass h-wing
|
Final | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PART |
Chad Schwendiman
|
|
|
Gas Piping in Mechanical room Phone #: ###-#### Inspection requested via web by Brent Lacy - 60lb gas pressure pass for the boilers. H-wing not ready yet
|
Pressure Test | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PART |
Chad Schwendiman
|
|
|
Would like to schedule this inspection for Thursday afternoon. Phone #: ###-#### Inspection requested via web by Brent Lacy - 60lb gas pass on h-wing 1st floor
|
Pressure Test | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Eric Strole
|
|
|
60 lb pressure test on main pass.
|
Pressure Test | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | NR |
Eric Strole
|
|
|
|
Pressure Test | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | CANC |
Eric Strole
|
|
|
|
Pressure Test | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy
|