Final | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Eric Strole
|
|
|
Call so I can meet you on site Phone #: ###-#### Inspection requested via web by Kirk Johns
|
Final | 3/1/2015 | 3/2/2015 | 3/2/2015 | A | FAIL |
Dixie Fellows
|
|
|
Call so I can walk thru if I''m available thanks Phone #: ###-#### >> Inspection requested via web by Kirk Johns..need clearance from exhaust and air intakes per the manuf..what happens to air intake in basement when they put in the ceiling? range needs to be installed with access to gas shut-off
|
Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PASS |
Eric Strole
|
|
|
Make up air Phone #: ###-#### Inspection requested via web by Kirk Johns
|
Rough-in | 12/8/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Eric Strole
|
|
|
Gas pressure test and hvac rough in Phone #: ###-#### Inspection requested via web by Kirk Johns-20 lb gas test and rough-in pass. (STILL NEED MAKE-UP AIR FOR KITCHEN EXHAUST)
|
Conference | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | DONE |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kirk Johns-Conferance over correction notice
|