Final | 11/24/2014 | 11/24/2014 | 11/24/2014 | P | PASS |
Bill VanDegrift
|
|
|
Please call tech Jake when on the way. Thank you. Phone #: ###-#### Inspection requested via web by James Staley final ok 60# gas test ok
|
Pressure Test | 11/24/2014 | 11/24/2014 | 11/24/2014 | P | PASS |
Bill VanDegrift
|
|
|
Please call tech Jake when on the way. Thank you. Phone #: ###-#### Inspection requested via web by James Staley 60# gas test ok
|
Final | 11/17/2014 | 11/18/2014 | 11/18/2014 | A | CANC |
Dixie Fellows
|
|
|
Please call Jake with any questions. Thank you! Phone #: ###-#### >> Inspection requested via web by James Staley Inspection cancelled from web by: James Staley
|
Pressure Test | 11/17/2014 | 11/18/2014 | 11/17/2014 | A | CANC |
Dixie Fellows
|
|
|
gas test and w/h inspection for tankless w/h. Phone #: ###-#### >> Inspection requested via web by James Staley Inspection cancelled from web by: James Staley
|
Final | 11/12/2014 | 11/13/2014 | 11/13/2014 | P | FAIL |
Bill VanDegrift
|
|
|
Please call Dave prior to arrival. ###-#### Phone #: ###-#### Inspection requested via web by James Staley 1) flue test required 2) shutoff valves upstream of the requlators 3) 50 cu. ft. of combustion air required for every 1000 btu's 4) 60# gas test to go to a 2# system gas test needs to be added to the permit
|