Final | 4/12/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Dixie Fellows
|
|
|
Matt ###-#### Phone #: ###-#### >> Inspection requested via web by Krista Boss
|
Final | 4/7/2015 | 4/8/2015 | 4/8/2015 | P | NR |
Bill VanDegrift
|
|
|
Matt ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
Conference | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | DONE |
Troy James
|
|
|
is this ok?,, 415
|
Rough-in | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Troy James
|
|
|
No equipment set at this time. Informed building contractor that the return air duct through closet is required to be ducted.
|
Rough-in | 11/25/2014 | 11/25/2014 | 11/25/2014 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rosa Salausa Need to have the manual j revised to reflect t;he two 12" supply plenum at main level and the 4 supply runs ok to tie into 12" supply main furnace. Ok to cover
|