Final | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | PASS |
Chad Schwendiman
|
|
|
Work is complete
|
Pressure Test | 3/3/2015 | 3/4/2015 | 3/4/2015 | P | PASS |
Chad Schwendiman
|
|
|
MUST be there between 1-2 to meet with the installers/gas company. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - 60lb gas pass on 6 lines from meters to regulators
|
Pressure Test | 2/24/2015 | 2/24/2015 | 2/24/2015 | P | PASS |
Chad Schwendiman
|
|
|
Please be in the later afternoon with call on way Chuck ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - 60lb gas pass on 1 new line to roof.
|
Pressure Test | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Chad Schwendiman
|
|
|
Please meet Chuck at the site at 3pm with call on way ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - 20lb gas pass on temporary gas lines
|
Conference | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | DONE |
Chad Schwendiman
|
|
|
Please call Chuck to see what need to happen. ###-#### Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - went by meet with chuck. They are putting in Gas flex for temporary gas lines from the meter to The north side of the fire wall where the existing lines are uneffected by the roof collapsing. I told them they need to pressure test the new temporary lines up to the point they connect to the existing lines.
|