Final | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | PASS |
Dixie Fellows
|
|
|
Call Chris if questions. Phone #: ###-#### >> Inspection requested via web by Debbie Marino...ALL CORRECTIONS MADE EXCEPT FOR THE CLEARANCES AROUND THE GAS COOK-TOP WHICH WERE APPPROVED BY JENIFER GILLILAND AND BILL VANDERGRIFT.
|
Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino..no air balance..w/h not vented..need clearances around cook-top..where is the outside air location for the cook-top??
|
Pressure Test | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | PASS |
Dixie Fellows
|
|
|
Duct blast at 2 pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino..20lb gas ok..duct blast ok
|
Rough-in | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | PASS |
Dixie Fellows
|
|
|
Duct blast at 2 pm Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Pressure Test | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | NR |
Dixie Fellows
|
|
|
Duct Blast at 9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | NR |
Dixie Fellows
|
|
|
Duct Blast at 9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino..ducy blast not ready
|