Final | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Bill VanDegrift
|
|
|
Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs
|
Final | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | PEND |
Dixie Fellows
|
|
|
Contact Ryan with questions ###-####. Contact owner for access ###-#### Phone #: ###-#### >> Inspection requested via web by Lea Briggs..need to resolve clearances around the gas cook-top
|
Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Eric Strole
|
|
|
Permit has been adjusted. Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs
|
Rough-in | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | FAIL |
Dixie Fellows
|
|
|
Manuals will be onsite Phone #: ###-#### >> Inspection requested via web by Lea Briggs..need to permit all the bath exhausts, range and dryer vents
|
Rough-in | 1/27/2015 | 1/28/2015 | 1/28/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Contact Ryan with questions ###-####. Inspection requested via web by Lea Briggs - need approved acca report on site
|
Pressure Test | 1/28/2015 | 1/28/2015 | 1/28/2015 | P | PASS |
Chad Schwendiman
|
|
|
Contact Ryan with questions ###-####. Inspection requested via web by Lea Briggs - 20lb gas pass
|
Rough-in | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | NR |
Dixie Fellows
|
|
|
Contact Ryan with questions ###-####. Phone #: ###-#### >> Inspection requested via web by Lea Briggs..no manual j on site...ryan will reschedule for wed
|
Pressure Test | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PART |
Bill VanDegrift
|
|
|
Gas and flue pressure tests. Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs 5# flue test ok gas not ready will do gas when ri is ready
|