Rough-in | 2/20/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Troy James
|
|
|
14th floor
|
Final | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Troy James
|
|
|
14th floor and the 15th floor
|
Rough-in | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | CANC |
Troy James
|
|
|
To cover on the 14th // Rick Phone #: ###-#### rescheduled for monday afternoon per contractor
|
Rough-in | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Troy James
|
|
|
We need inspection to cover ceiling on 15th floor, please call Rick. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum ok to cover the 15th floor
|
Final | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | CANC |
Troy James
|
|
|
We need inspection to cover ceiling on 15th floor, please call Rick. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum (This activity was added in error so we have changed the case status back to Issued.)
|