Final | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Chad Schwendiman
|
|
|
Please Contact Dave for access ###-####. Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs
|
Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Chad Schwendiman
|
|
|
On site contact Dave Friend ###-####. Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs
|
Rough-in | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | FAIL |
Troy James
|
|
|
Please call dave for access ###-####. Contact Ryan with questions ###-####. Phone #: ###-#### >> Inspection requested via web by Lea Briggs need insulation shield at b-vent in attic and duct blast test required before final inspection. Need to attach mechanical permit to the building permit
|
Pressure Test | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Bill VanDegrift
|
|
|
Contact Ryan with questions ###-####. Phone #: ###-#### Inspection requested via web by Lea Briggs 20# gas test ok no man. J required on theis job. usung existing equipment
|