Final | 5/6/2015 | 5/7/2015 | 5/7/2015 | P | PASS |
Chad Schwendiman
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Pressure Test | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Chad Schwendiman
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann - 60lb gas pass on the roof
|
Pressure Test | 3/10/2015 | 3/11/2015 | 3/11/2015 | A | PART |
Chad Schwendiman
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann - 20lb gas pass on all low pressure piping, Still need to do 60lb test upstream of regulator on roof
|
Pressure Test | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Bill VanDegrift
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 20# gas test ok, header at cook line to just aboue ceiliong
|