Final | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | PASS |
Bill VanDegrift
|
|
|
Heating only insulated plenum for correction notice Phone #: ###-#### Inspection requested via web by Ray Bolinger
|
Final | 7/20/2015 | 7/21/2015 | 7/21/2015 | A | FAIL |
Bill VanDegrift
|
|
|
lock box code if needed is 2500 Phone #: ###-#### Inspection requested via web by Ray Bolinger 1) reilif valve required on water heaters piped to an approved location. 2) provide access to roof to verify terminations. 3) complete gas connections. 4) 4" clearance required infront of center unit. 5) provide installation instructions for the direct vent conversion kit to verify approved material. 6) insulate plenum in crawl.
|
Rough-in | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Bill VanDegrift
|
|
|
Cover reinspection Phone #: ###-#### Inspection requested via web by Ray Bolinger ri ok
|
Rough-in | 2/16/2015 | 2/17/2015 | 2/17/2015 | A | NR |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Ray Bolinger 1) complete dryer ducting 2) pan return and seal 3) need to have the gas installed prior to cover (being done by another cntractor)
|