Final | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Rough-in | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Pressure Test | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino-20 lb gas test & flue test pass
|
Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino-8" fresh air needs to tie into return air plenum and need heat sheild on b-vent.
|