Final | 3/3/2015 | 3/5/2015 | 3/4/2015 | P | PASS |
Chad Schwendiman
|
|
|
james ###-#### is contact should be ready for 3pm inspection Phone #: ###-#### Inspection requested via web by Brenda St Clair
|
Pressure Test | 3/3/2015 | 3/4/2015 | 3/4/2015 | P | PASS |
Chad Schwendiman
|
|
|
James will be ready at 3 Phone #: ###-#### Inspection requested via web by Brenda St Clair - 5lb flue pass
|
Final | 3/3/2015 | 3/4/2015 | 3/3/2015 | P | CANC |
Chad Schwendiman
|
|
|
Will be ready by 3pm James is contact ###-#### Phone #: ###-#### >> Inspection requested via web by Brenda St Clair Inspection cancelled from web by: Brenda St Clair
|
Pressure Test | 3/3/2015 | 3/4/2015 | 3/3/2015 | P | CANC |
Chad Schwendiman
|
|
|
Should be done by 3pm James is the contact, ###-#### Thanks! Phone #: ###-#### >> Inspection requested via web by Brenda St Clair Inspection cancelled from web by: Brenda St Clair
|