Final | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | PASS |
Alan Hauser
|
|
|
|
Final | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 3/18/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Fireplace & house r/i - Oleg Phone #: ###-#### 1) provide approved ACCA report 2) wrong equipment installed 3) complete outside air ducting
|
Pressure Test | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Bill VanDegrift
|
|
|
Fireplace & house r/i - Oleg Phone #: ###-#### 20# gas test ok
|