Conference | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Chad Schwendiman
|
|
|
Final inspection please. Phone #: ###-#### Inspection requested via web by Nick Drake
|
Final | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Chad Schwendiman
|
|
|
Final inspection please. Phone #: ###-#### Inspection requested via web by Nick Drake
|
Pressure Test | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Chad Schwendiman
|
|
|
Please call Laren Barfuss before going out at ###-####. Thank you, Jennifer @ Drake Mechanical. Phone #: ###-#### Inspection requested via web by Nick Drake - 20lb gas pass
|
Pressure Test | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | FAIL |
Chad Schwendiman
|
|
|
Please call Laren Barfuss before going out at ###-####. Thank you, Jennifer at Drake Mechanical. Phone #: ###-#### Inspection requested via web by Nick Drake - 20lb gas pressure fail
|
Pressure Test | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Laren Barfuss - tech on project at ###-#### before going out. Thank you, Jennifer at Drake Mechanical. Phone #: ###-#### Inspection requested via web by Nick Drake - 60lb gas from meter to reg pass. 20lb gas down stream of reg fail. need to find leak and retest.
|