Final | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Chad Schwendiman
|
|
|
This job was finished on the 14th but I didn''t get a final on it. Can you fix that is your system. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
Pressure Test | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PASS |
Chad Schwendiman
|
|
|
Please call Terry or Judy on way ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter - 20lb gas pass
|
Pressure Test | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | NR |
Chad Schwendiman
|
|
|
Please be in the mid afternoon with a call to Ryan for ETA ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|