Final | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Chad Schwendiman
|
|
|
Call ahead to Eric @ ###-#### so he can meet the inspector on-site. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
Pressure Test | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Chad Schwendiman
|
|
|
Call ahead to Eric @ ###-#### so he can meet the inspector on-site to complete the flue pressure test on a high eff furnace installation. Phone #: ###-#### Inspection requested via web by Angie Maguire - 5lb flue pass
|
Final | 4/20/2015 | 4/21/2015 | 4/21/2015 | P | NR |
Chad Schwendiman
|
|
|
Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
Pressure Test | 4/20/2015 | 4/21/2015 | 4/21/2015 | P | NR |
Chad Schwendiman
|
|
|
Flue pressure test for high eff furnace installation. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire
|