Final | 10/15/2015 | 10/16/2015 | 10/16/2015 | A | PASS |
Chad Schwendiman
|
|
|
JAMES IS THE JOB CONTACT ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Rough-in | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PART |
Bill VanDegrift
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER hydronic piping test in the penthouse ok
|
Rough-in | 9/2/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Dixie Fellows
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER...4th floor ok and tested
|
Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PART |
Bill VanDegrift
|
|
|
KIETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor hydronic loop ok
|
Rough-in | 5/13/2015 | 5/14/2015 | 5/14/2015 | A | PART |
Bill VanDegrift
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER basenment mechanical room hydronic loop and second floor hydronic loop test ok
|
Pressure Test | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PEND |
Dixie Fellows
|
|
|
JAMES IS THE JOB CONTACT ###-####. Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER..THIS NEEDS TO BE ATTACHED TO THE BUILDING PERMIT ON LINE...AFTER THIS IS DONE I WILL DOCUMENT THE INSPECTION. THANKS
|
Pressure Test | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PASS |
Dixie Fellows
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER..final 2 lines ok at 100lbs
|
Pressure Test | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | PART |
Chad Schwendiman
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 100lb hydronic pass for the three lines with the gauges in the basement.
|