Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Bill VanDegrift
|
|
|
hi Dixie you will have to call Dan Hemmer to gain access give him at least a 1/2 hour before you get there thanks Dave the manual-j and ballance report or at the furnace upper leavel my # is ###-#### Inspection requested via web by David Petsche
|
Rough-in | 9/17/2015 | 9/17/2015 | 9/17/2015 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by David Petsche Inspection cancelled from web by: David Petsche
|
Rough-in | 6/2/2015 | 6/2/2015 | 6/2/2015 | A | PASS |
Dixie Fellows
|
|
|
rough in and preasure test Phone #: ###-#### >> Inspection requested via web by David Petsche..r/i and 20lb gas ok..flue test ok..hood less than 400 cfm
|