Final | 5/8/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Chad Schwendiman
|
|
|
The inspector needs to be there from 8:00 to 8:30 to meet our tech on-site to complete a final. The home owner could only be home first thing in the a.m. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
Pressure Test | 5/8/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Chad Schwendiman
|
|
|
The inspector needs to be there from 8:00 to 8:30 to meet our tech on-site to complete a flue pressure test. The home owner could only be home first thing in the a.m. Phone #: ###-#### Inspection requested via web by Angie Maguire - 5lb flue pass
|
Final | 5/6/2015 | 5/7/2015 | 5/7/2015 | P | NR |
Chad Schwendiman
|
|
|
Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
Pressure Test | 5/6/2015 | 5/7/2015 | 5/7/2015 | P | NR |
Chad Schwendiman
|
|
|
Flue pressure test for high eff furnace installation. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire
|