Final | 9/9/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Dixie Fellows
|
|
|
please call john with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
|
Final | 9/9/2015 | 9/9/2015 | 9/9/2015 | P | PART |
Dixie Fellows
|
|
|
call john with questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige..waiting on a call from Chad regarding access doors on dampers...2nd layer of fire wrap is fine
|
Rough-in | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Chad Schwendiman
|
|
|
final grease duct. Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Rough-in | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | NR |
Chad Schwendiman
|
|
|
Final grease duct inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige - 2nd layer hasn't been installed yet
|
Rough-in | 8/25/2015 | 8/27/2015 | 8/27/2015 | P | CANC |
Chad Schwendiman
|
|
|
final grease duct Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Pressure Test | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | PASS |
Chad Schwendiman
|
|
|
60lb gas pass
|
Rough-in | 8/25/2015 | 8/26/2015 | 8/26/2015 | P | CANC |
Chad Schwendiman
|
|
|
grease duct inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige - 1st layer of wrap pass
|
Conference | 8/25/2015 | 8/27/2015 | 8/25/2015 | P | CANC |
Chad Schwendiman
|
|
|
final grease duct inspection Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Rough-in | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | CANC |
Chad Schwendiman
|
|
|
final grease inspection Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Conference | 8/25/2015 | 8/27/2015 | 8/25/2015 | P | CANC |
Chad Schwendiman
|
|
|
final grease duct inspection please call dru Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Rough-in | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | CANC |
Chad Schwendiman
|
|
|
this is a pm grease duct inspection Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Rough-in | 8/21/2015 | 8/24/2015 | 8/24/2015 | P | PASS |
Chad Schwendiman
|
|
|
this is a pm grease duct inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige - light test on grease duct pass
|
Rough-in | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | PASS |
Chad Schwendiman
|
|
|
please call 1 hr in advance so we can meet you on site.
thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige - okay to cover fire lid
|
Rough-in | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | CANC |
Chad Schwendiman
|
|
|
please call john 1 hr in advance so he can meet you on site. Phone #: ###-#### Inspection requested via web by Nicholas Paige - This was a conference, I entered 1 for it.
|
Conference | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | DONE |
Chad Schwendiman
|
|
|
please call john 1 hr in advance so he can meet you on site. Phone #: ###-#### Inspection requested via web by Nicholas Paige - Meet and discussed fire damper sleeve installation. They wanted to know if they could install the sleeves for the fire dampers and hook them up and get inspected for cover prior to installing the fire dampers in the sleeves. I told them I would be okay with that as long as they had the instalation instructions there at the time of the sleeve inspection.
|
Rough-in | 6/24/2015 | 6/25/2015 | 6/25/2015 | A | PART |
Bill VanDegrift
|
|
|
please call John 1 hr in advance so he can meet you onsite.
thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige. conference ok
|
Rough-in | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | NR |
Bill VanDegrift
|
|
|
fire wrap cover inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige Mechanical inspections cannot be performed until the architect provides an approved design for the rated assembly between floors addressing penetration protection
|
Rough-in | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PASS |
Chad Schwendiman
|
|
|
please call john with any questions Phone #: ###-#### Inspection requested via web by Nicholas Paige - light test on grease duct pass, rough in pass
|
Rough-in | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - need some one to meet me here, need to light test new grease duct, need to verify fire dampers installed per approved plans.
|