Final | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Eric Strole
|
|
|
Please meet at 3 - Will Phone #: ###-####
|
Final | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | CANC |
Eric Strole
|
|
|
would like call ahead; WIll Phone #: ###-####
|
Rough-in | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Eric Strole
|
|
|
Will Phone #: ###-####-Basement rough-in pass.( Need to test pvc flue by final.)
|
Rough-in | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | FAIL |
Eric Strole
|
|
|
Will// rough-in for basement Phone #: ###-####-Per green sticker 20 lb gas test pass, need to repipe flue and retest and need heat sheild on b-vent and need approved manual-j on site.
|
Pressure Test | 6/23/2015 | 6/23/2015 | 6/24/2015 | P | PEND |
Troy James
|
|
|
work in progress
|
Rough-in | 6/23/2015 | 6/23/2015 | 6/24/2015 | P | PASS |
Troy James
|
|
|
Will Phone #: ###-#### Furnace installed is not per the approved manual j. Need to change to 80,000 with 5 ton blower by final. All exposed ducts in basement are to be insulated.
|