Final | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PASS |
Chad Schwendiman
|
|
|
Please call Mark, Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Rough-in | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Dixie Fellows
|
|
|
Please call Mark ###-####, thank you! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum...OK TO OCCUPY AREA..S/F DAMPER OK ( ALL METAL STUDS AND ANGLES INSTALLED) IN OFFICE B-17 AND STORAGE B-16..DAMPER IS IN THE WALL BETWEEN THESE ROOMS
|
Rough-in | 8/19/2015 | 8/20/2015 | 8/21/2015 | A | PART |
Bill VanDegrift
|
|
|
Please call Mark, Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum ok for ceiling tile in new basement section
|
Rough-in | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Troy James
|
|
|
Please call Mark, thank you! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum conference inspection mostly, verified some fire/smoke damper installations
|
Rough-in | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | PART |
Dixie Fellows
|
|
|
Please call Mark, Thank YOU! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum..duct sealed..ok to insulate
|