Final | 9/10/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | FAIL |
Eric Strole
|
|
|
Please check for new Manual J documents on site. Minor duct changes were approved 7/2/15 Phone #: ###-#### Inspection requested via web by Bryan Palmer-New manual-j was never approved on 7-2-15. No approved manual-j on site.
|
Pressure Test | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-20 lb gas test and flue test pass
|
Rough-in | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-Supply plenum in basement is under sized per manual-j. Calls for a 20x8. Installed a 14x8.
|