Final | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | PASS |
Eric Strole
|
|
|
call ahead to Tom @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
Pressure Test | 7/16/2015 | 7/17/2015 | 7/17/2015 | P | PASS |
Eric Strole
|
|
|
Flue pressure test for high eff furnace installation. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire-Flue test pass
|
Final | 7/16/2015 | 7/17/2015 | 7/17/2015 | P | NR |
Eric Strole
|
|
|
Call ahead to Tom @ ###-#### or Eric @ ###-#### to coordinate inspection time and verify the install is complete. Phone #: ###-#### Inspection requested via web by Angie Maguire-Not ready
|