Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee
|
Pressure Test | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - 20lb gas pass
|
Pressure Test | 9/16/2015 | 9/17/2015 | 9/17/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Pressure test and ceiling cover. Thank You! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - gauge won't zero out
|
Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PART |
Bill VanDegrift
|
|
|
Ceiling cover. Please call Ben on your way so he can meet you there. Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee ok for tile in the office area. needs gas to the unit in the ceiling still and insulation was against the b-vent of the unit in the office. didn't approve the unit heater in the shop area it will be ready at final.
|
Rough-in | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PART |
Alan Hauser
|
|
|
hard ceiling area ok for cover
|