Final | 11/6/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Eric Strole
|
|
|
Larry Givens is the builder. His number is ###-#### Inspection requested via web by Dustin Rich
|
Rough-in | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Eric Strole
|
|
|
questions call ival ###-#### Inspection requested via web by Dustin Rich
|
Rough-in | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | FAIL |
Eric Strole
|
|
|
any questions, Ival ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich-Need approved manual-j on site foe rough-in.
|
Pressure Test | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Eric Strole
|
|
|
any questions, Ival ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich-20 lb gas test and flue test pass
|