Final | 9/28/2015 | 9/30/2015 | 9/30/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Allison
|
Rough-in | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison
|
Rough-in | 8/23/2015 | 8/24/2015 | 8/24/2015 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison..need 1" clearance at flue at ceiling..need to fir out framing around b-vent to meet clearance..need 10" x11" upper and lower comb air...REINSPECTION FEE
|
Final | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison..THIS SHOULD BE A R/I !!! NEED 1" CLEARANCE AT B-VENT..NEED 3 SCREWS AT CONNECTION...NEED TO FIRE-STOP AND CAULK AT FLOORS...NEED COMB AIR...WILL NEED TO SEE CLEARANCE WHEN THEY BOX IN THE FURN FLUE
|
Pressure Test | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Dixie Fellows
|
|
|
>> Inspection requested via web by Brad Allison..20lb gas ok
|
Final | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison...doors locked
|
Pressure Test | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison..doors locked
|
Final | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | NR |
Alan Hauser
|
|
|
|
Pressure Test | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | NR |
Alan Hauser
|
|
|
|