Final | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Ben Livingston
|
|
|
if questions call Jim Brekke here at the office ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Mec-Aging Inspection | 8/17/2017 | 8/17/2017 | 8/17/2017 | | CANC |
Ben Livingston
|
|
|
|
Mec-Aging Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | | PEND |
Ben Livingston
|
|
|
|
Mec-Aging Inspection | 2/16/2017 | 2/16/2017 | 2/16/2017 | | PEND |
Ben Livingston
|
|
|
|
Final | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PART |
Ben Livingston
|
|
|
PARTIAL FINAL - Call Shane if questions - Gas inspection Annex 4th Floor Phone #: ###-#### Inspection requested via web by Stacia Haumann 4th floor
|
Pressure Test | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PART |
Ben Livingston
|
|
|
Gas Pressure Test - Meter to Annex Kitchen. If questions call Shane @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 60 lb gas annex temp. temp C O Office all floors
|
Pressure Test | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
Ben Livingston
|
|
|
GEOTHERMAL ROOM. If questions call Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 60 lb gas final run to meter
|
Pressure Test | 9/26/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
Ben Livingston
|
|
|
GEOTHERMAL ROOM. If questions call Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann heating and geothermal hydronic 100 psi in mech room
|
Pressure Test | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PART |
Chad Schwendiman
|
|
|
Hydronic Pressure Test - 1st Floor Office. If questions call Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann - 100lb hydronic pass for 1st floor stack 1 and 2
|
Pressure Test | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PASS |
Ben Livingston
|
|
|
Hydro Test in the mechanical/chiller room. For any Additional questions please contact Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia - Haumann chiller mechanical room 100lb
|
Pressure Test | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Ben Livingston
|
|
|
if questions call Mike @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60 lb gas from basment to 5th floor.
|
Pressure Test | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Ben Livingston
|
|
|
3rd Floor Hydrostatic Inspection. Any Questions please call Mike @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- 3rd floor 100lb test
|
Pressure Test | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | CANC |
Troy James
|
|
|
pressure test, 3rd floor annex. for any questions please call Mike Fullmer @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann they wanted plumbing inspection
|
Rough-in | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | PASS |
Troy James
|
|
|
MEC-Hydro Static Test for AHU ; CT. Any questions please contact Mike Fullmer @ ###-#### Thank You, Holly Grago Phone #: ###-#### Inspection requested via web by Stacia Haumann ok hydronic test on roof main bld
|
Rough-in | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Ben Livingston
|
|
|
Hydronic hydrostatic test 8th ; 9th floors. If questions call Shane @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 8 and 9th floor hydronic 100lb test mains
|
Rough-in | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Troy James
|
|
|
Hydrostatic Test - Roof ; Shaft (basement to 6th floor). if questions call Mike @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann ok hot and chilled lines from basement to AH on roof to annex bldg
|
Rough-in | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Troy James
|
|
|
Hydro static test - 2nd floor Annex. If questions call Mike @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann ok hydronic test 100# second floor annex
|
Rough-in | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Ben Livingston
|
|
|
Hydronic Hydro Static Test on basement through 10th floor shaft. if you have any questions please call Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia - Haumann- 100lb hydronic basement to 10th floor
|
Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Ben Livingston
|
|
|
Hydronic Rough-In. if questions call Mike @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 7th floor hydronics 100lb
|
Rough-in | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PASS |
Ben Livingston
|
|
|
Hydronic Hydrostatic test - 7th Floor Phone #: ###-#### Inspection requested via web by Stacia Haumann- 6th floor hydronics office 100lb
|
Rough-in | 3/2/2016 | 3/2/2016 | 3/2/2016 | P | PASS |
Troy James
|
|
|
Shane ###-####-hydronics for the 5th floor-condensate for 2-5th floors
|
Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Ben Livingston
|
|
|
hydronic 4th floor office - hydrostatic test. if questions call shane @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 4th floor 100lb main hydronic heat and chilled
|
Conference | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Ben Livingston
|
|
|
2nd floor hydronics hydro static test - office. if questions call Shane @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- 2nd floor 100lb chilled and heat. hydronic piping
|
Rough-in | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Troy James
|
|
|
3rd floor Hydro Static test - per Shane Stowe ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann ok heat and chilled hydronics third floor
|