Final | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Pressure Test | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Chad Schwendiman
|
|
|
20lb gas, 5lb flue pass
|
Rough-in | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | FAIL |
Chad Schwendiman
|
|
|
exhaust fans not installed yet. Ducts are not sized or routed per the approved acca report. Need to submitt a new report for approval or install per approved report.
|
Pressure Test | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | CANC |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves Inspection cancelled from web by: Gary Reeves
|
Rough-in | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | CANC |
Chad Schwendiman
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves Inspection cancelled from web by: Gary Reeves
|