Final | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PASS |
Chad Schwendiman
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Chad Schwendiman
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Bill VanDegrift
|
|
|
hydronic test on mains through this unit and the future tenant on the north side
|
Rough-in | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | NR |
Bill VanDegrift
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|