Final | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Chad Schwendiman
|
|
|
Please call Brian when your headed out ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek
|
Rough-in | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | CANC |
Troy James
|
|
|
Thanks, Brian Phone #: ###-#### Inspection requested via web by Andrea Creek Contractor did not know why an inspection was scheduled. Inform him to seal all ducts joints
|
Pressure Test | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | PASS |
Chad Schwendiman
|
|
|
This is an underground inspection. For questions call brian at ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek - 20lb gas pass on underground piping for patio
|
Rough-in | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PART |
Chad Schwendiman
|
|
|
This is a partial inspection. Please contact brian before going @ ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek - 60LB gas pass into the bldg, 20lb gas inside the bldg to the appliances. okay to cover the soffits and walls
|