Final | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Final | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-####- arma flex need to be protected from u v rays. recommend u v protective paint
|
Rough-in | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Chad Schwendiman
|
|
|
Oleg// please call before Phone #: ###-#### - 20lb gas, 5lb flue r/i
|
Rough-in | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-#### - Missing 6 inch fresh air to return air plenum. crawl not complete.
|
Pressure Test | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Oleg Phone #: ###-#### corrections not made
|
Rough-in | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Oleg Phone #: ###-#### corrections not made
|
Conference | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | FAIL |
Chad Schwendiman
|
|
|
mec rouf in /gas presh/firepl rouf in Phone #: ###-#### Inspection requested via web by Oleg Chervak - Missing return air transfer in master bedroom, 5lb flue fail on ah-1, need make up air for range hood, need combustion air for furnaces and water heater, builder is installing solid doors on mech closet.
|