Final | 3/17/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez
|
Rough-in | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez- 20lb gas, 5lb flue, rough in
|
Rough-in | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Arcadio Martinez-dryer vent needs nail plate at floor penetration. bvent needs 1 inch clearance from insulation shield, romex needs to move. main floor return not per manual s. pressure gauges on both gas and flue dont zero out.
|