Final | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Chad Schwendiman
|
|
|
Call rob please9194971 Inspection requested via web by william kerwin
|
Conference | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PART |
Chad Schwendiman
|
|
|
Bj 5730755 Inspection requested via web by william kerwin - temporary occupancy okay, Still need to complete the condensate in units 309, 319, 223
|
Final | 8/31/2016 | 8/31/2016 | 8/31/2016 | A | FAIL |
Chad Schwendiman
|
|
|
5730755 Inspection requested via web by william kerwin - still need to remove fire caulk from dampers in mechanical rooms per previous discussions
|
Conference | 8/31/2016 | 8/31/2016 | 8/31/2016 | A | CANC |
Chad Schwendiman
|
|
|
Bj 5730755 >> Inspection requested via web by william kerwin Inspection cancelled from web by: william kerwin
|
Final | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PART |
Chad Schwendiman
|
|
|
bj ###-#### Inspection requested via web by william kerwin - all units okay except for 110, 113, 212, 223, 225, 227, 303, 309, 311, 319, 324
|
Rough-in | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | CANC |
Chad Schwendiman
|
|
|
Dropped ceiling inspection Inspection requested via web by william kerwin - this is the wrong permit
|
Rough-in | 5/11/2016 | 5/11/2016 | 5/11/2016 | A | PASS |
Chad Schwendiman
|
|
|
3rd floor drop ceilings Inspection requested via web by william kerwin
|
Rough-in | 5/6/2016 | 5/6/2016 | 5/6/2016 | P | PART |
Chad Schwendiman
|
|
|
Phone ###-#### Rooms 127, and 124 - okay to cover rooms 127, 124, and the 2nd floor except for room 219
|
Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PART |
Chad Schwendiman
|
|
|
Drop ceiling inspection Inspection requested via web by william kerwin - Okay to cover bathroom ceilings on the 1st floor except for rooms 127, 124
|
Rough-in | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Rob - ###-#### - Need to fix gaps in retaining angles
|
Rough-in | 3/31/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Chad Schwendiman
|
|
|
Firedamper indpection Inspection requested via web by william kerwin - Okay to cover bottom of the tgi's and trusses in the bathrooms on all three floors
|
Rough-in | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PART |
Chad Schwendiman
|
|
|
Rob 9194971 Inspection requested via web by william kerwin - okay to cover ceilings and walls except for the bathrooms and mechanical room ceilings where the fire dampers are missing.
|