Final | 1/30/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | PART |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- temp occupancy ok- signed temporary occupancy card
|
Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | NR |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- misc loose ends
|
Pressure Test | 11/4/2016 | 11/8/2016 | 11/8/2016 | A | PASS |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- chilled water from Mezz to chiller hydronic test pass
|
Pressure Test | 11/4/2016 | 11/7/2016 | 11/4/2016 | A | CANC |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Pressure Test | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 100lbs test pass- glycol supply and return for AHU 2 west side and VAV systems
|
Pressure Test | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | NR |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- will reschedule
|
Pressure Test | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Brian Scoles
|
|
|
60lb gas pass at meter manifold connection outside building- rework gas line AB area for duct work install
|
Pressure Test | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | CANC |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- scheduled for later today
|
Pressure Test | 8/17/2016 | 8/18/2016 | 8/18/2016 | P | PART |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 2 inch 60lb gas pass- 1.5 inch 60lb gas pass- 1.25 60lb gas pass in building AB and AA - tests from meter to valves and highlighted prints in office
|
Pressure Test | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Brian Scoles
|
|
|
100lb hydronic pass area AC
|
Pressure Test | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Brian Scoles
|
|
|
60lb hydronic pass area AC
|
Rough-in | 8/4/2016 | 8/5/2016 | 8/5/2016 | P | CANC |
Brian Scoles
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - area AC hydronic pass
|
Pressure Test | 7/5/2016 | 7/6/2016 | 7/6/2016 | P | PASS |
Troy James
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER ok test to hydronic
|
Pressure Test | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PART |
Alan Hauser
|
|
|
test ok on both supply and return chilled water
|
Pressure Test | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | FAIL |
Chad Schwendiman
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 100lb hydronic piping fail on the underground
|
Pressure Test | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | NR |
Chad Schwendiman
|
|
|
ROB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - Not ready Rescheduled for this afternoon
|