Final | 9/2/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Chad Schwendiman
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
Final | 8/31/2016 | 9/2/2016 | 9/1/2016 | A | CANC |
Eric Strole
|
|
|
Calll Jason with any issues @ 412.6696 Phone #: ###-#### >> Inspection requested via web by Dawn Kalsbeek Inspection cancelled from web by: Dawn Kalsbeek
|
Rough-in | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Eric Strole
|
|
|
By final need access panels for 3 tubs with slip nuts on waste and overflows.
|
Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | FAIL |
Eric Strole
|
|
|
Call jason with any issues @ 412.6696 - Thank you!! Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek-Need approved manual-j on site for r/i inspection.
|
Pressure Test | 3/23/2016 | 3/23/2016 | 3/23/2016 | A | PASS |
Eric Strole
|
|
|
20 lb gas test and flue test pass.
|